Electrical sizing, calculations and verification
Conductor sizing, short circuit and protection coordination, load calculation, EMC, functional safety and rule sets – all part of the project check – and the inspection and test report of the installation.
Electrical sizing
Electrical sizing (IEC 60204-1): the wires behind a protective device – from its
load side through main contacts and overload relays – must carry its rated current
(part Current, the upper value of a setting range; current-carrying capacity per
table 6, method B2); cables get their voltage drop to the load with the highest rated
current at their ends (√3 for three cores, copper at operating temperature), report
Cable sizing; the check reports too thin wires and cables (errors) and voltage
drops above 5 %. The capacity is corrected for ambient temperature, bunched
circuits (IEC 60364-5-52, B.52.17), aluminium and XLPE insulation. A fuse switch
disconnector fitted with solid links (part subgroup Solid link, the isolation before
and after the transformers of a metering) isolates only: it protects nothing, has no
selectivity of its own and the current passes it; the load of a cable is the rated
current of the part providing the function at its end (the motor operator on a
circuit breaker, not the breaker).
Electrical calculations and verification
Electrical calculations and verification (Tools › Electrical calculations…):
- Supply: voltage, earthing system (TN-S, TN-C, TN-C-S, TT, IT), highest and lowest short-circuit current at the supply point, rated current;
- Short circuit and protection coordination (IEC 60909-0 for radial networks,
IEC 60364-4-41, -4-43): the source from the short-circuit currents at the supply
point (with its R/X) or from a transformer (rated power, uk, load losses, correction
factor KT) and the network upstream (S''kQ); the cables from the supply to each
protective device and on to the end of its circuit; asynchronous motors on the
mains add ILR / IrM = 5 (or
Locked rotor current) when they exceed 1 % of the supply's current. The protective devices of the mains with their time-current bands (IEC 60898-1 B / C / D / K / Z, motor protection class 10, gG / aM fuses, electronic LSI trip units withLong-time delay,Short-time pickup,Short-time delay; part tech dataCharacteristic,Breaking capacity,Making capacity,Instantaneous trip,Let-through energy,Pre-arcing energy), replaced by the manufacturer's curves where given (Trip curve min/Trip curve max:1.5: 600; 3: 20; 10: 0.01in multiples of In,Let-through energy: 1 kA: 8000; 6 kA: 25000). Checked: breaking capacity against the short-circuit current and making capacity against its peak (κ from R/X), disconnection at the lowest fault current at the end of each circuit within the times of table 41.1 by U0 (TN 0.8 / 0.4 / 0.2 / 0.1 s, TT 0.3 / 0.2 / 0.07 / 0.04 s, distribution circuits 5 s / 1 s; TT: residual current device needed; IT: the second fault, at U or with a distributed neutral at U0), k²S² withstand of the cables, selectivity with the device upstream (total / partial up to a current) from the manufacturer's coordination table, gG fuses at a ratio of 1.6, the pre-arcing energy of a fuse upstream or the time-current bands; back-up protection from the coordination table covers a too low breaking capacity. The coordination tables (selectivity and back-up limits in kA by part number) are edited in the window and withcoordination_table. Reports Short circuit and disconnection, Selectivity (with its basis); - Load calculation: motors, drives, heaters, power supplies and transformers of the
mains with active / apparent power and current (
Power,Current,Power factor,Efficiency), the load of each protective device, demand with the rated diversity factor of IEC 61439-1 (table 101) or a set factor, phase currents and unbalance, and the load budget of each 24 V power supply (Coil power,Current consumption); reports Load calculation, Power supply load budget; - EMC: motor cables of frequency converters shielded at both ends, analogue signals in shielded cables, no power and signal conductors in one cable, surge protection;
- Functional safety (ISO 13849-1): safety functions of subsystems with their devices,
category, DCavg, operations per year and CCF; PL by the simplified procedure
(figure 5) from
MTTFd/B10dof the parts or certifiedPL/PFHd, combined by table 11 or, where every subsystem has a PFHd, by their sum, with the matching SIL; a second channel of other devices is symmetrised (D.2), the DCavg comes from theDCof the devices when the subsystem gives none (annex E), devices whose T10d falls within the mission time of 20 years are named for replacement; report Safety functions; - Rule sets: built-in libraries (IEC 60204-1, IEC 61439-1, UL 508A / NFPA 79, ISO 13849-1, EMC) and customer rule sets (JSON import / export) that tighten the limits (voltage drop, disconnection times, minimum cross-sections, load reserve, phase unbalance, total selectivity, shielding, surge protection) and add checks "every item of a scope (project, pages, devices, parts, cables, connections, potentials) that meets these conditions must meet this one"; report Rule set verification; all results are part of the project check.
Inspection and test report
The inspection and test report (initial verification, IEC 60364-6 / DIN VDE
0100-600) has four parts: the data of the report with the visual inspection, the
sources of SELV, PELV and separated circuits, the circuits with their results, and the
verdict with the signature. It is shown in the reports Inspection and test report
(the circuits), Inspection and test report: SELV, PELV and separation and
Inspection and test report: summary, edited in the pane Tools › Inspection and test report of the editor (the same
sections as the web page: report data and visual inspection, limits, signature, a
section per source and per circuit, Export Excel), in Project data › Edit in table
(Inspection and test report, one row per circuit, and Inspection and test report:
data, one row per value of the report and of the sources), with the command
inspection_report and on the web page of the project server.
The circuits are the protective devices fed from the mains, in schematic order, filled in from the schematic:
- circuit (device tag), description (of the device, otherwise its function text), phases, the cables behind the device with their types, the cross-section (of the cables, otherwise of the wires);
- protective device: tripping characteristic and rated current (part data, as for the short-circuit calculation);
- residual current device protecting the circuit (its own or one upstream) with its
type (
Residual current typeof the device or of its part; anS, as inA S, marks a selective one) and rated residual current; - the highest loop impedance that passes: two thirds of U0 / Ia (Ia: the current that disconnects within the time of table 41.1; IEC 60364-6, annex C; also in TT systems, 411.5.4; IT: the second fault, U / 2 Ia or with a distributed neutral U0 / 2 Ia, 411.6.4), or where a residual current device protects the circuit U0 / IΔn (TN, IT) and 50 V / IΔn (TT: RA × IΔn ≤ UL, 411.5.3; Zs includes RA).
What the project does not give is shown as missing, never assumed: no characteristic C, no 30 mA and no limit resting on them, unlike the calculations, which assume them.
The results of a circuit, kept as entered (0,35, > 500) and checked against their
limits:
| Result | Limit |
|---|---|
| Continuity of the protective conductor (Ω) | no limit in the standard; next to it the resistance calculated from the cables of the circuit (length, cross-section, conductor material at 20 °C), a hint above 1.5 times of it |
| Insulation test voltage (V) | at least 500 V up to 500 V nominal, 1000 V above (table 6.1) |
| Insulation L–PE (MΩ; the line conductors, or all live conductors connected together, against PE) | at least 1 MΩ |
| Insulation N–PE and L–N (MΩ, where measured apart) | at least 1 MΩ |
| Loop impedance Zs (Ω) | the highest loop impedance above |
| Voltage drop (%) | the limit of the rule sets (5 % without one) |
| RCD tripping current (mA) | ½ IΔn … IΔn |
| RCD tripping time at IΔn (ms) | at most 300 ms; type S 130 … 500 ms |
| RCD tripping time at 5 × IΔn (ms) | at most 40 ms; type S 50 … 150 ms |
| Contact voltage UB at IΔn (V) | at most 50 V |
| Polarity | OK / Not OK |
| Phase sequence (three-phase circuits) | OK / Not OK |
| Function test (switchgear, interlocks, controls) | OK / Not OK |
| Tested by, date, test instrument, remark | recorded |
A circuit is Not passed when a value is out of its limit or a test failed, Passed when the continuity, the insulation (with its test voltage), the loop impedance, the polarity, the function test, (three-phase) the phase sequence and (with an RCD) the tripping time at IΔn are there, Incomplete in between and Not tested without values.
SELV, PELV and electrical separation (6.4.3.4): every power supply and transformer
of the schematic is a source, with its output voltage (the part's Voltage after the
/, as in 230 V / 24 V DC, or Output voltage; DC for power supplies, AC for
transformers). The inspector chooses its protective measure – SELV, PELV, electrical
separation or none of its own – and enters the insulation of its circuits against
other circuits and earth with the test voltage: SELV and PELV at least 250 V and
0.5 MΩ (table 6.1), electrical separation as the mains. A SELV or PELV source above
50 V AC or 120 V DC does not pass.
The fault current measured at the origin is checked against the breaking
capacities of the protective devices (part data, Breaking capacity; 434.5.1): a
device fed directly from the origin whose breaking capacity is lower does not pass,
one further down (where the fault current is lower) is marked to check; back-up
protection by the device upstream (coordination tables) covers it.
The data of the report: client, installation site, installer, reason for the test (new installation, extension, change, repair), inspector, test instruments (IEC 61557), the values measured at the origin (external loop impedance Ze, prospective fault current, earth electrode resistance RA, main equipotential bonding, the resistance of insulating floors and walls of non-conducting locations: at least 50 kΩ up to 500 V, 100 kΩ above, IEC 60364-4-41, C.1) and the date of the next inspection. In a TT system RA must not exceed 50 V / the largest rated residual current of the installation. In an IT system the report adds the function test of the insulation monitoring device and the current of a first fault Id, which must not exceed 50 V / RA (411.6.2). The visual inspection (6.4.2) answers 16 items with OK, Not OK or Not applicable: protection against electric shock, fire barriers, conductors, protective devices, isolating and switching devices, external influences, identification of N and PE, single-pole switching devices in the line conductors, diagrams and warning notices, labelling, connections, protective and bonding conductors, accessibility, additional protection by RCDs of at most 30 mA, surge protection, measures against electromagnetic disturbances. Own items are added for the installation (the items of the edition the installation is verified against, a customer's checklist); they take part in the verdict like the others.
The limits are settings of the report: each has a default and its source, and a
project sets other values where the edition of the standard it is verified against
differs (Limits on the report card of the web page, the rows limit.<name> of
Inspection and test report: data, limit.<name> in the header of
inspection_report). The defaults were compared with public secondary sources
(manufacturers' and training documents) in November 2026, not with the text of the
standards:
| Limit | Default | Source |
|---|---|---|
| Lowest insulation resistance of the mains | 1 MΩ | IEC 60364-6, table 6.1 (6A in the 2006 edition) |
| Lowest insulation resistance and test voltage of SELV and PELV | 0.5 MΩ at 250 V | IEC 60364-6, table 6.1 |
| Share of U0 / Ia the measured loop impedance may reach | ⅔ | IEC 60364-6, informative annex (C.61.3.6.2 of the 2006 edition); BS 7671 uses 0.8 |
| Conventional touch voltage limit UL | 50 V | IEC 60364-4-41, 411.5.3 (TT), 411.6.2 (IT) |
| RCD trip time at IΔn / 5 × IΔn | 300 ms / 40 ms | IEC 61008-1, IEC 61009-1 |
| Selective RCDs at IΔn / 5 × IΔn | 130 – 500 ms / 50 – 150 ms | IEC 61008-1, IEC 61009-1 |
| Highest voltage of SELV and PELV | 50 V AC, 120 V DC | IEC 60364-4-41, 414.1.1 |
| Insulating floors and walls | 50 kΩ up to 500 V, 100 kΩ above | IEC 60364-4-41, C.1 (UK guidance uses 0.5 MΩ) |
| Protective conductor: hint above the calculated resistance | 1.5 times | OpenECraft; the standard sets no limit |
The verdict of the report is Not passed when a circuit, a source, an item of the visual inspection or a value of the report fails, Passed when every circuit and source passed, every item is answered, the inspector named, (TT) RA measured and (IT) the insulation monitoring device tested. Signing records who signed and when; any later change of the data or of a result takes the signature away. The report exports as an Excel workbook (on the web page with a summary sheet, the circuits and the sources).
On site, with a tablet or a phone: the web page of the project server (project server) shows the report of every project under Inspection and test report: a card with the data of the report, the visual inspection, the verdict and Sign the report, a card per source of SELV, PELV or separated circuits, then a card per circuit with the data of the schematic and the fields of the results (number keyboard, the limit next to each field, values out of the limits marked at once; the insulation test voltage, who tests, today and the last instrument are filled in for a new circuit). Who may save reviews or edit the project enters them there and saves each card on its own, without opening the project and without a lock; values not yet saved stay in the browser (also across a lost connection). The editors that have the project open take them over with the next revision; their own saves keep them (the data and the results are merged card by card, as the review records). Excel downloads the report.