Documentation

Electrical sizing, calculations and verification

Conductor sizing, short circuit and protection coordination, load calculation, EMC, functional safety and rule sets – all part of the project check – and the inspection and test report of the installation.

Electrical sizing

Electrical sizing (IEC 60204-1): the wires behind a protective device – from its load side through main contacts and overload relays – must carry its rated current (part Current, the upper value of a setting range; current-carrying capacity per table 6, method B2); cables get their voltage drop to the load with the highest rated current at their ends (√3 for three cores, copper at operating temperature), report Cable sizing; the check reports too thin wires and cables (errors) and voltage drops above 5 %. The capacity is corrected for ambient temperature, bunched circuits (IEC 60364-5-52, B.52.17), aluminium and XLPE insulation. A fuse switch disconnector fitted with solid links (part subgroup Solid link, the isolation before and after the transformers of a metering) isolates only: it protects nothing, has no selectivity of its own and the current passes it; the load of a cable is the rated current of the part providing the function at its end (the motor operator on a circuit breaker, not the breaker).

Electrical calculations and verification

Electrical calculations and verification (Tools › Electrical calculations…):

Inspection and test report

The inspection and test report (initial verification, IEC 60364-6 / DIN VDE 0100-600) has four parts: the data of the report with the visual inspection, the sources of SELV, PELV and separated circuits, the circuits with their results, and the verdict with the signature. It is shown in the reports Inspection and test report (the circuits), Inspection and test report: SELV, PELV and separation and Inspection and test report: summary, edited in the pane Tools › Inspection and test report of the editor (the same sections as the web page: report data and visual inspection, limits, signature, a section per source and per circuit, Export Excel), in Project data › Edit in table (Inspection and test report, one row per circuit, and Inspection and test report: data, one row per value of the report and of the sources), with the command inspection_report and on the web page of the project server.

The circuits are the protective devices fed from the mains, in schematic order, filled in from the schematic:

What the project does not give is shown as missing, never assumed: no characteristic C, no 30 mA and no limit resting on them, unlike the calculations, which assume them.

The results of a circuit, kept as entered (0,35, > 500) and checked against their limits:

ResultLimit
Continuity of the protective conductor (Ω)no limit in the standard; next to it the resistance calculated from the cables of the circuit (length, cross-section, conductor material at 20 °C), a hint above 1.5 times of it
Insulation test voltage (V)at least 500 V up to 500 V nominal, 1000 V above (table 6.1)
Insulation L–PE (MΩ; the line conductors, or all live conductors connected together, against PE)at least 1 MΩ
Insulation N–PE and L–N (MΩ, where measured apart)at least 1 MΩ
Loop impedance Zs (Ω)the highest loop impedance above
Voltage drop (%)the limit of the rule sets (5 % without one)
RCD tripping current (mA)½ IΔn … IΔn
RCD tripping time at IΔn (ms)at most 300 ms; type S 130 … 500 ms
RCD tripping time at 5 × IΔn (ms)at most 40 ms; type S 50 … 150 ms
Contact voltage UB at IΔn (V)at most 50 V
PolarityOK / Not OK
Phase sequence (three-phase circuits)OK / Not OK
Function test (switchgear, interlocks, controls)OK / Not OK
Tested by, date, test instrument, remarkrecorded

A circuit is Not passed when a value is out of its limit or a test failed, Passed when the continuity, the insulation (with its test voltage), the loop impedance, the polarity, the function test, (three-phase) the phase sequence and (with an RCD) the tripping time at IΔn are there, Incomplete in between and Not tested without values.

SELV, PELV and electrical separation (6.4.3.4): every power supply and transformer of the schematic is a source, with its output voltage (the part's Voltage after the /, as in 230 V / 24 V DC, or Output voltage; DC for power supplies, AC for transformers). The inspector chooses its protective measure – SELV, PELV, electrical separation or none of its own – and enters the insulation of its circuits against other circuits and earth with the test voltage: SELV and PELV at least 250 V and 0.5 MΩ (table 6.1), electrical separation as the mains. A SELV or PELV source above 50 V AC or 120 V DC does not pass.

The fault current measured at the origin is checked against the breaking capacities of the protective devices (part data, Breaking capacity; 434.5.1): a device fed directly from the origin whose breaking capacity is lower does not pass, one further down (where the fault current is lower) is marked to check; back-up protection by the device upstream (coordination tables) covers it.

The data of the report: client, installation site, installer, reason for the test (new installation, extension, change, repair), inspector, test instruments (IEC 61557), the values measured at the origin (external loop impedance Ze, prospective fault current, earth electrode resistance RA, main equipotential bonding, the resistance of insulating floors and walls of non-conducting locations: at least 50 kΩ up to 500 V, 100 kΩ above, IEC 60364-4-41, C.1) and the date of the next inspection. In a TT system RA must not exceed 50 V / the largest rated residual current of the installation. In an IT system the report adds the function test of the insulation monitoring device and the current of a first fault Id, which must not exceed 50 V / RA (411.6.2). The visual inspection (6.4.2) answers 16 items with OK, Not OK or Not applicable: protection against electric shock, fire barriers, conductors, protective devices, isolating and switching devices, external influences, identification of N and PE, single-pole switching devices in the line conductors, diagrams and warning notices, labelling, connections, protective and bonding conductors, accessibility, additional protection by RCDs of at most 30 mA, surge protection, measures against electromagnetic disturbances. Own items are added for the installation (the items of the edition the installation is verified against, a customer's checklist); they take part in the verdict like the others.

The limits are settings of the report: each has a default and its source, and a project sets other values where the edition of the standard it is verified against differs (Limits on the report card of the web page, the rows limit.<name> of Inspection and test report: data, limit.<name> in the header of inspection_report). The defaults were compared with public secondary sources (manufacturers' and training documents) in November 2026, not with the text of the standards:

LimitDefaultSource
Lowest insulation resistance of the mains1 MΩIEC 60364-6, table 6.1 (6A in the 2006 edition)
Lowest insulation resistance and test voltage of SELV and PELV0.5 MΩ at 250 VIEC 60364-6, table 6.1
Share of U0 / Ia the measured loop impedance may reach⅔IEC 60364-6, informative annex (C.61.3.6.2 of the 2006 edition); BS 7671 uses 0.8
Conventional touch voltage limit UL50 VIEC 60364-4-41, 411.5.3 (TT), 411.6.2 (IT)
RCD trip time at IΔn / 5 × IΔn300 ms / 40 msIEC 61008-1, IEC 61009-1
Selective RCDs at IΔn / 5 × IΔn130 – 500 ms / 50 – 150 msIEC 61008-1, IEC 61009-1
Highest voltage of SELV and PELV50 V AC, 120 V DCIEC 60364-4-41, 414.1.1
Insulating floors and walls50 kΩ up to 500 V, 100 kΩ aboveIEC 60364-4-41, C.1 (UK guidance uses 0.5 MΩ)
Protective conductor: hint above the calculated resistance1.5 timesOpenECraft; the standard sets no limit

The verdict of the report is Not passed when a circuit, a source, an item of the visual inspection or a value of the report fails, Passed when every circuit and source passed, every item is answered, the inspector named, (TT) RA measured and (IT) the insulation monitoring device tested. Signing records who signed and when; any later change of the data or of a result takes the signature away. The report exports as an Excel workbook (on the web page with a summary sheet, the circuits and the sources).

On site, with a tablet or a phone: the web page of the project server (project server) shows the report of every project under Inspection and test report: a card with the data of the report, the visual inspection, the verdict and Sign the report, a card per source of SELV, PELV or separated circuits, then a card per circuit with the data of the schematic and the fields of the results (number keyboard, the limit next to each field, values out of the limits marked at once; the insulation test voltage, who tests, today and the last instrument are filled in for a new circuit). Who may save reviews or edit the project enters them there and saves each card on its own, without opening the project and without a lock; values not yet saved stay in the browser (also across a lost connection). The editors that have the project open take them over with the next revision; their own saves keep them (the data and the results are merged card by card, as the review records). Excel downloads the report.

This document in the repository

More documentation

Getting started: from the first page to the bill of materials

This tutorial walks through a small control circuit in OpenECraft: pages, symbols, wires, devices with parts, terminals, a PLC, the project check, reports, the panel layout and the output. Commands are written as Tab ›…

Read

Installation and building

Packages for Windows, Linux and macOS, the web version, and building from source.

Read

User interface

The editor's layout and the commands and keys of everyday work. New users start with the tutorial.

Read

Schematic editor

Pages, devices and their structure, live cross references, editing tools, navigators and project storage. The user interface lists the commands and keys.

Read

Symbols and libraries

The built-in symbol libraries (IEC, NFPA / JIC, GB, GOST, JIS, fluid power, P&ID, single-line) and the symbol editor for own symbols.

Read

Wires, cables, potentials and numbering

How connections get their cable, colour, cross-section and number, and how devices, pages and wires are numbered.

Read

Terminal strips, plugs, PLC and marking

Terminal strips with multi-level terminals and accessories, plugs, PLC cards with the exchange to PLC programming tools, and the markers for the workshop.

Read

Macros, configurator and table editing

Reuse of circuits as macros with variants and placeholders, pages generated by the configurator, and bulk changes in tables and spreadsheets.

Read

Parts management

The parts database shared by all projects (EPLAN style): commercial, technical and mounting data, function templates, connection points, 2D / 3D graphics and the import of manufacturer data. Parts are shared between…

Read

Reports, forms and the project check

Reports as windows, CSV / Excel or live report pages, title blocks and report forms (also graphical and own drawn forms), and the project check with its message management.

Read

Panel layout, rooms and 3D routing

OpenECraft aligns the device's clip to the rail centerline. For Beckhoff's 12 × 100 × 68 mm EL I/O housings with 8 or 16 terminals, and the matching EK1100 coupler, the rail center is 63.8 mm from the top. For example…

Read

Wiring and mounting assistants

The panel layout as a checklist for the workshop, on a desktop or a tablet.

Read

Fluid power, process and plant engineering

Hoses and pipes in their own nets, electro-fluid links, PCT loops, the pre-planning of the plant and single-line / multi-line engineering.

Read

Wire harnesses

Harnesses with 3D topology, protections and fixings, KBL export, the harness interface for machines and nailboard drawings (Connections › Harnesses…). The example project conveyor has a door harness.

Read

Output and data exchange

PDF, DXF / DWG, SVG and 3D exports, DXF / DWG import, the enterprise integration layer (ERP, PDM, PLM, ECAD, MCAD, procurement, wiring machines) and Autodesk Vault.

Read

Revisions, review and change management

Revisions with locked pages and marked changes, the approval workflow, baselines with compare and merge, comments and redlining, and change requests.

Read

Command line, MCP server and plugins

Projects and the parts server without a window, for scripts and AI agents.

Read

Plugins

OpenECraft is extended through the openecraft-api crate. A plugin adds

Read

Parts server and parts manager

The data portal shared by all OpenECraft installations and the app that maintains it.

Read

Project server

Shared projects for a team: several users work on the same project, each page is locked by one of them.

Read

Access control of the servers

The parts server and the project server share one access model: users sign in with a local account or with a directory (Active Directory, OpenLDAP or another LDAP server), and what they may do comes from roles given to…

Read